Underground Mining and Gold Processing PlantSurface Transport & Logistics
Consultancy Services for Feasibility Study, Social and Environmental Impact Assessment Study and Facilitation of Financial Close for the proposed underground mining, and Gold Processing plant (CIP) at Ng’anzo area, Bukombe district in Geita, Mwanza.
Client
NGM Mini Limited
Po Box 20
Bariadi
Gungu Nsagali
nsagali1974@gmail.com
Services rendered
- Assess supportive economic infrastructure which includes transport network, energy source, water supply, sanitation, telecommunication and specific attraction in the project influence area;
- Work out the estimated total investment costs for the proposed project which includes mining equipments, and accommodation;
- Advise on the financing structure, sources of funds and facilitate sourcing of funds for financial institutions;
- Propose project management structure during and after construction and the associated remuneration packages;
- Carry out EIA and SIA for the proposed project;
- Oversight plant design with respect to the ore reserve;
- Carryout pit optimisation and so financial modelling for the project;
- Conduct economic and financial analysis to determine the project viability and present financial indicators i.e. Net Present Value (NPV); Internal Rate of Return (IRR); Average Return on Investment (RoI) and Payback Period
- Facilitate fund sourcing from banks for project implementation
Dates of
implementation
June 2014 – Aug. 2014